Thermal Break Bolt on Balcony Connection Details



 

 
 
 

Bolt On Balconies

 

Technical Details

 

The bolt on balcony system consists of two stages.
 
Stage one is the first fix and involves a ThermConX thermal break connection being incorporated into the structure of the building as it is being erected.
 
Generally a stub connection is then fitted to allow the external cladding of the envelope to progress unhindered by obstructions. 
 
A bolt on balcony is concurrently manufactured offsite at our factory in Nottinghamshire and held in our finished goods yard to be called into site when required. 
 
Stage Two is the second fix which connects the balcony to the building via the first fix attachment.
 
Our special purpose access equipment makes this possible at a much later date in the build program, even after all of the scaffolding has been removed.
 
*      IMPORTANT PLEASE READ CAREFULLY      *
All images, designs & technical drawings are the sole property of ARCHTECHNIK.
It is an offence to reproduce in anyway any of the images, designs or technical drawings shown here without written permission.